5cbm LCO2 TANK
Upper liquid inlet: Open the upper liquid inlet for the first time to reduce the temperature of the storage tank
Lower liquid inlet: open the lower liquid inlet for normal use
Liquid inlet: connect the upper liquid inlet and the lower liquid inlet
Drain port 1: storage tank liquid outlet (can be connected to pipeline steel cylinder)
Drain 2: tank outlet (spare)
Full indication: Prompt when full of liquid
The upper port of the liquid level gauge/the lower port of the liquid level gauge: all need to be opened for the first use
Vent port: Let the naturally evaporated gas be discharged to the atmosphere through the valve, and the pressure in the tank will not increase
Residual liquid port: open the exhaust and residual liquid to empty the storage tank when the tank is not applicable
Exhaust port: Let the naturally evaporated gas be discharged to the atmosphere through this valve, so that the pressure in the tank will not rise
Self-pressurization system: to ensure that the pressure is automatically adjusted when the pressure is low, and there is a pressure-adjusting valve on it
Pressure relief device port: It plays a safety role, when the storage tank cannot work normally and the pressure is too high
Safety valve: When the pressure is high, it will automatically release the pressure