Home » cryogenic LNG storage tank » Before filling the LNG storage tank with sand, the pearl sand is specially dehydrated and pretreated
Before filling the LNG storage tank with sand, the pearl sand is specially dehydrated and pretreated
Sixth, the pearl sand is specially dehydrated and pretreated before filling the sand, and the interlayer is heated and replaced with nitrogen, which greatly reduces the degassing source.
Contact US
Get Price
Share:
Content
Sixth, the pearl sand is specially dehydrated and pretreated before filling the sand, and the interlayer is heated and replaced with nitrogen, which greatly reduces the degassing source.
Inquiry
More cryogenic LNG storage tank