Home » cryogenic LNG storage tank » Before filling the LNG storage tank with sand, the pearl sand is specially dehydrated and pretreated

Before filling the LNG storage tank with sand, the pearl sand is specially dehydrated and pretreated

Sixth, the pearl sand is specially dehydrated and pretreated before filling the sand, and the interlayer is heated and replaced with nitrogen, which greatly reduces the degassing source.
Rated 5/5 based on 586 customer reviews
Share:
Content

Sixth, the pearl sand is specially dehydrated and pretreated before filling the sand, and the interlayer is heated and replaced with nitrogen, which greatly reduces the degassing source.

Inquiry


    More cryogenic LNG storage tank