The liquid inlet pipe and return steam pipe of the pump should be equipped with metal corrugated hoses.
The inlet pipe, return steam pipe and valve should have a good thermal insulation and cold in...
Contact US
Get Price
Share:
Content
The liquid inlet pipe and return steam pipe of the pump should be equipped with metal corrugated hoses.
The inlet pipe, return steam pipe and valve should have a good thermal insulation and cold insulation layer, so that the liquid entering the pump head has enough sub-cooling to prevent the liquid from vaporizing in the pump to affect the normal operation of the liquid.
The venting valve in the return line must be installed close to the pump head, within a distance of 0.5 m.