Customized liquefied gas storage tank manufacturer Project handover and acceptance

1 After completing all the engineering projects according to the scope stipulated in the contract, the handover procedures should be handled with the construction unit in time.   2 Before the ...
Rated 4.7/5 based on 441 customer reviews
Share:
Content

1 After completing all the engineering projects according to the scope stipulated in the contract, the handover procedures should be handled with the construction unit in time.

 

2 Before the handover and acceptance of the project, the construction unit shall inspect the industrial metal pipeline project to confirm the following:

 

2.1 The scope and content of the construction conform to the provisions of the contract.

 

2.2 The project quality complies with the design documents and the provisions of this code.