Home » LPG station » LPG station construction

LPG station construction

The raw materials and welding consumables at the construction site are under unified management by the project department;   Welding requirements and flaw detection ratio shall be implemented...
Rated 5/5 based on 219 customer reviews
Share:
Content

The raw materials and welding consumables at the construction site are under unified management by the project department;

 

  1. Welding requirements and flaw detection ratio shall be implemented in accordance with the regulations:

 

  1. GB50236-2011 “Code for Construction and Acceptance of Field Equipment and Industrial Metal Pipeline Welding Engineering”

 

  1. GB50235-2010 “Code for Construction and Acceptance of Industrial Metal Engineering”

 

The inspection and test methods and pressure test values shall be carried out in accordance with the “Code for Design of Urban Gas” GB50028-2006;

 

acceptance and safety inspection and supervisory inspection;

 

Civilized construction and safe production.

Inquiry


    More LPG station