1.3 Equipment and pipelines that are not allowed to be purged should be isolated from the purging system.

 

1.4 Before the pipeline is purged, orifice plates, flange-connected regulating valves, important valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments that are welded, bypass or remove the valve Protective measures such as head and valve seat plus protective sleeve.

 