3.3 Before the construction of the project, the basic floors, trenches and other projects related to the installation and construction should be completed, and the concrete strength should not be l...
Rated 5/5 based on 589 customer reviews
Share:
Content

3.3 Before the construction of the project, the basic floors, trenches and other projects related to the installation and construction should be completed, and the concrete strength should not be less than 75% of the design strength. The installation construction site and nearby building materials, soil, and debris should be etc. should be cleaned up.

 

3.4 When meteorological conditions do not meet the equipment installation requirements, measures should be taken.