Home » LPG Tank » LPG storage tank pipe prefabrication

LPG storage tank pipe prefabrication

The welding, assembly and inspection of piping components shall comply with the relevant provisions of Chapters 5~7 of this code.   The prefabricated pipe section should be cleaned inside and...
Rated 4.7/5 based on 292 customer reviews
Share:
Content

The welding, assembly and inspection of piping components shall comply with the relevant provisions of Chapters 5~7 of this code.

 

  1. The prefabricated pipe section should be cleaned inside and the nozzle should be closed in time. The pipe section shall not be deformed during storage and transportation.

 

1 The original mark should be transplanted before the tube is cut. Steel stamps are strictly prohibited for cryogenic steel pipes and titanium pipes.

 

2 Carbon steel pipes and alloy steel pipes should be cut by mechanical methods. When oxyacetylene flame cutting is used, it is necessary to ensure that the dimensions are correct and the surface is smooth.

Inquiry


    More LPG Tank