Home » LPG Tank » LPG tank equipment
LPG tank equipment
After the equipment is inspected and passed the inspection, the outer surface will be derusted as a whole, and the anti-rust primer and top coat will be applied twice respectively, and a circle of ...
Contact US
Get Price
Share:
Previous:
LPG tank details
Next:
LPG storage tank process
Content
After the equipment is inspected and passed the inspection, the outer surface will be derusted as a whole, and the anti-rust primer and top coat will be applied twice respectively, and a circle of red ribbon will be painted with paint along the horizontal centerline of the tank body, and the words “no fireworks” will be printed on the top of the center of gravity mark. The height of the logo and characters shall not be less than 200mm;
After heat treatment, the equipment is not allowed to be welded except on the pre-welded plate.
Inquiry
More LPG Tank