Check whether there is moisture in the discharged air flow.
Contact US
Get Price
Share:
Content
Check whether there is moisture in the discharged air flow. If there is moisture, continue to purge until there is no moisture and stop purging. Tighten the joints at both ends of the differential pressure (liquid level) gauge and close the LNG tank balance valve to keep the differential pressure (liquid level) gauge in normal working condition. Before the first filling of LNG in the tank, LNG gas should be used to replace the liquid nitrogen or nitrogen in the tank.