Preparation work before using LNG tank2

Check whether there is moisture in the discharged air flow.

Rated 5/5 based on 205 customer reviews
Share:
Content

Check whether there is moisture in the discharged air flow. If there is moisture, continue to purge until there is no moisture and stop purging. Tighten the joints at both ends of the differential pressure (liquid level) gauge and close the LNG tank balance valve to keep the differential pressure (liquid level) gauge in normal working condition. Before the first filling of LNG in the tank, LNG gas should be used to replace the liquid nitrogen or nitrogen in the tank.