filling job
1. Open all valves in the liquid phase pipe between the liquid outlet and the dispenser. and open all valves in the return pipe.
2. Supply air to the fluid port pneumatic isolating valve to the open position, so that the liquefied petroleum gas in the storage tank communicates with the filling pump.