Open the top liquid inlet valve and bottom liquid inlet valve of the cryogenic storage tank at the same time, slowly open the top liquid inlet valve of the tank truck, and use the low-temperature g...
Rated 4.8/5 based on 352 customer reviews
Share:
Content

Open the top liquid inlet valve and bottom liquid inlet valve of the cryogenic storage tank at the same time, slowly open the top liquid inlet valve of the tank truck, and use the low-temperature gas in the tank truck to pre-cool the cryogenic storage tank for 1~2 minutes. During this period, the manual vent valve should always be opened to ensure that the nitrogen in the cryogenic tank can be completely removed during replacement.