Foundation and sand bed construction, Tank lifting.

Rated 4.8/5 based on 328 customer reviews
Share:
Content

Foundation and sand bed construction: First a suitable foundation needs to be prepared, ensuring that the settlement is even and level. The foundations can be direct soil bearing.
Tank lifting: The roof plate is lifted onto the rollers at the access opening using a crane, and then pulled by a combination of winches and fixed pulleys to the top mesh shell of the steel tank. This process requires a combination of relevant structural mechanics knowledge to ensure the safety of the entire installation process.